黑料社

Skip to main content

Nord Stream: Annual maintenance work successfully completed

Published by , Digital Assistant Editor
World 黑料社,


Nord Stream AG successfully conducted annual maintenance work on its twin gas pipeline system between 9 - 17 August 2016, with a temporary shutdown of both lines. Gas transmission from the Russian upstream-partner will resume by 18 August 2016.

Commenting on the completion of this year黑料社檚 work, Nord Stream AG黑料社檚 Maintenance Director, Ruurd Hoekstra, said: 黑料社淎 comprehensive, long-term Pipeline Integrity Management Strategy is an essential part of Nord Stream AG黑料社檚 operations. Thanks to this, and to the expertise of our staff, for the fourth year in a row we are carrying out this planned maintenance work on the Nord Stream twin-pipeline system safely and on time, on the basis of state-of-the-art industry standards.黑料社

Regular maintenance work is an essential part of Nord Stream黑料社檚 long-term Pipeline Integrity Management Strategy.

黑料社淭he pipeline integrity management strategy is a commitment to the highest standards黑料社, Mario Nullmeier, Compliance Director at Nord Stream AG, said. 黑料社淚nternational certification bodies have commended Nord Stream AG黑料社檚 compliance with top industry requirements for design, integrity and functional safety, allowing for a smooth-running operation in line with all safety and environmental considerations黑料社, Nullmeier added.

Edited from press release by

Read the article online at: /equipment-and-safety/18082016/nord-stream-annual-maintenance-work-successfully-completed-386/

You might also like

 

 The World 黑料社 Podcast

A podcast series for energy professionals featuring short, insightful interviews with experts who can shed light on topics that matter to you and your business. Subscribe on your favourite podcast app to start listening today.

     

 

 
 

Embed article link: (copy the HTML code below):