Eliminating a rathole trip: case study from Baker Hughes

World 黑料社,


The Baker Hughes GaugePro鈩 Echo on-command digital reamer with StaySharp鈩 cutter technology enabled an operator in the Gulf of Mexico to drill and ream a section, then ream the rathole in one run, eliminating a second trip typically needed to ream the rathole. The operator saved 36 hours of rig time 黑料社 the operating equivalent of US$2.1 million.

Deepwater well in the Gulf of Mexico

The challenging deepwater well required a durable, long-lasting reamer to enlarge the wellbore through several types of hard, abrasive formations. Additionally, a solution was needed to overcome the limitations of ball-drop reamers that required placement above the directional drilling bottomhole assemblies (BHAs), forcing a second trip to complete reaming of the rathole section.

黑料社淭he GaugePro Echo digital reamer is a highly reliable tool that can be placed near the bit to combine drilling and reaming sections, and then ream ratholes in one run,黑料社 says Ahmed Al-Essa, Global Marketing Manager for Baker Hughes Directional Drilling. 黑料社淚t offers unlimited activation and deactivation cycles, along with real-time information, including blade status and position, hydraulic oil pressure, temperature, and vibration. It also includes a triple failsafe system to ensure it can trip out of hole. The reamer operates independently of pump flow rates, and we are able to individually control up to three GaugePro Echo reamers in a single BHA.黑料社

At 21 290 ft (6489 m), the cement plug was drilled through to 22 073 ft (6728 m), and a main reamer placed above the BHA continued drilling and reaming to a total depth (TD) of 25 760 ft (7852 m). The BHA was then pulled back to 25 584 ft (7798 m), where the GaugePro Echo reamer, located near the bit in the BHA, was engaged within five minutes. Blade status was confirmed on surface via digital communication from the reamer, and the reamer began enlarging the rathole from 12录 in. to 14陆 in.

Using the gamma ray log, the drilling engineer was able to identify limestone stringers and shale sections, and to recommend optimum rotations per minute and weight-on-bit for best reaming performance. Rate of penetration ranged from 50 ft/hr (15.2 m/hr) to 70 ft/hr (21.3 m/hr).

The reamer finished opening the rathole at 25 739 ft (7845 m), reducing it from 176 ft (53.7 m) to 21 ft (6.4 m), and was pulled out of hole in excellent condition. 黑料社淭he subsequent casing run and cement operation was a success with higher than expected formation integrity test results,黑料社 Al-Essa says.


Written by , edited for web by

Read the article online at: /special-reports/22122014/eliminating-a-rathole-trip-case-study-from-baker-hughes/

You might also like

 

 The World 黑料社 Podcast

A podcast series for energy professionals featuring short, insightful interviews with experts who can shed light on topics that matter to you and your business. Subscribe on your favourite podcast app to start listening today.

     

 

 
 

Embed article link: (copy the HTML code below):